Fitout of entire building from Cat A landlords specification including 30 traders with chilled desks; a 2nd floor client suite, MER and SER.
New Critical electrical infrastructure installed throughout the building with a 350 kVA generator installed on roof and 2N UPS systems installed in basement.
New Critical chilled water system installed with 90 kW chillers installed on the roof for the MER, SER, Trader desks, UPS and security room cooling.