The second of two new build Data Centres on the Campus. For the first DC we provided a Peer Review, for the second DC we were engaged to provide full design duties. We have provided full design duties from Stage 2 (Concept) through to Stage 4 (Technical Design).
The project delivered a new data centre consisting of 2 No. 2000kW and 2 No 3000kW data centre pods, including roof and ground floor external plant areas.
This project included new plant and controls system such as;
Dual MV supplies on-site – 132kV – 11kV.
15MVA of MV containerised generators providing N+1 redundancy within an external compound, complete with new generator control systems including G59 parallel operation.
New Static UPSs configured on a distributed redundant arrangement. 4 No per hall.
IAC solutions for the data halls based on N+1 redundancy.