Full duties, detailed design with full time resident engineers.
Bespoke fit out of the entire building (11 floors and basements)
3 trading floors suitable for 1760 trading positions using in-desk cooling with active chilled beams.
Dedicated resilience chilled and condenser water infrastructure serving critical cooling systems for trading, MERs ad SERs.
1500 covers main kitchen, restaurant and associated support areas.
Executive kitchen for hospitality/dining floors.
200 person auditorium and associated support areas.
Enhance standby generation and UPS supported electrical infrastructure to the trading floors, MERs, SERs and other business critical areas.
Gymnasium and additional toilets for increased occupational density.
Extensive rationalisation and supplementation of the building fresh air and ventilation system to satisfy increased occupant densities/overall building headcount.
Sustainability consultancy services undertaken.
Lift traffic analysis and new escalator installation to trading floors