Digital Realty

Crawley Campus

2 No. 3MW Halls & 2 No. 2MW Halls

2018

The second of two new build Data Centres on the Campus. For the first DC we provided a Peer Review, for the second DC we were engaged to provide full design duties. We have provided full design duties from Stage 2 (Concept) through to Stage 4 (Technical Design).

The project delivered a new data centre consisting of 2 No. 2000kW and 2 No 3000kW data centre pods, including roof and ground floor external plant areas.

This project included new plant and controls system such as;

Dual MV supplies on-site – 132kV – 11kV.

15MVA of MV containerised generators providing N+1 redundancy within an external compound, complete with new generator control systems including G59 parallel operation.

New Static UPSs configured on a distributed redundant arrangement. 4 No per hall.

IAC solutions for the data halls based on N+1 redundancy.