Generator Refurbishment

This project included the refurbishment of the original 1983 Harland and Wolff generator sets, as well as a replacement of the generator switchboard. The project also saw an introduction of a new dual redundant power monitoring system to integrate into the new generator switchboard, substations, BMS system etc.

The project was completed without disruption to Lloyd’s of London by means of temporary generators integrating into the existing utility substations.

Rising Busbar Replacement

This project comprised of the replacement of the essential and mechanical rising busbars which are currently installed within external service risers for each tower.